VINEYARDS IN CHICO

With the vision of alternative ways to generate more traffic and congestion on the strategic points of congestion especially at peak hours, the city of Ambato was involved in other streets of Chico Huachi sector by investing $ 185,000. On the street

Mogrovejo Garcia was placed 700 meters linear 63 mm PVC pipe on both sides of the road for water distribution, are placed 150 meters of sewer pipe with holes for review, potable water household connections and sewer, sidewalks and asphalt concrete placement of 5 cm at 5300 m2. This road joins with the output to Riobamba.

To complete the ring road was operated in the street Miguel de Santiago, the same way that ties the previous output to Guaranda, the following work was performed, placed 600 meters of PVC pipe of 63 mm for potable water, installation of household connections, built sidewalks and asphalt pavement was placed in an area of \u200b\u200b4200 m2.

With these two pathways provides the public transit alternative that will allow it to collapse the circle of Huachi, to directly benefit more than families living in the sector.

0 comments:

Post a Comment