NEW MUNICIPAL BUILDING IN CONSTRUCTION

The Municipality of Ambato construct the new municipal building. The work is performed under to plan and record progress of 10.03% of the work. The council invests 4 million 514 thousand 610 U.S. dollars, in an area of \u200b\u200b16,096 meters square. The contractor is Alvaro Guamán. The project is designed in three blocks: A block of four floors and 5 floors. In addition, two parking areas, one in the basement for 80 vehicles and one on the ground floor for 104 vehicles.


When you ran the Eastern block wall, central block wall, left side wall of the parking underground shaft columns 1 to 6 of the Eastern bloc, plinths for 6 columns in the central block, in the south block is built plinths for 10 columns, steel reinforcement and ready-mixed concrete plant.

Mucus Plug Miscarriage Early Pregnancy

IMPROVED VIA A SAN JOSE

The principal route of entry into the barrio San José de Pinllo, street Edmundo Martinez, the first section was paved in 2010, now complemented with the paving of the second tranche which will benefit families living in the area . Were operated with the execution of works including paving, sewer and curbs. They invested $ 66,000 in asphalt paving of 4,500 m2, now had 25 sewer service connections in homes that had not been built and 1,700 meters linear curbs.

With this type of work is generated road development in sectors previously had no access and services, fulfilling one of the objectives of the Municipal Administration, which is to provide connecting routes to all areas and parishes through the formation of ring roads, which in turn will enhance trade and productivity that characterizes the county. LLLL LLLLLLL





WORKS ABOUT MARKET AND COLLEGE

The Municipality of Ambato, within the planned work in the parishes of the canton, weighed in with the construction of works in the parish Pasa. It took part in the reconstruction of two buildings that make up the Central Market for $ 40 000, the first was completed and consists of a 350 m2 covered with sheet steel, floor tile, metal, electrical installations, lighting and paint, the second ship underwent reconstruction, change the cover on an area of \u200b\u200b250 m2 and laying ceramic tiles on the floor.

In the area of \u200b\u200beducation participated in the construction of a classroom teaching at the National College spends $ 14,000 to invest, it has the following features: reinforced concrete structure with an area of \u200b\u200b9.6 m2, three-story projection fully completed with doors, windows, electrical and flooring. These two works are serving the citizens of Pass and visitors who come to this important sector of the county. LLLL LLLLLLL






WAY WITH SERVICEABLE ATAHUALPA

At a cost of $ 43 000, the Municipality of Ambato improving Parish roads Atahualpa. There are 500 linear feet of street recapeo: El Sol, El Tejar and Valdivia, to improve access to families living in the sector.
The Tejar benefits the Atahualpa Technical College and The Sun connects to the main street of the parish, the avenue, "January 23", also intervened and recovered by the administration. These jobs offer better
vent access and road traffic and attention to residents and entities that make use of them. LLLLL


LLLLLLLLL


BUILD, PREMISES WITHOUT WALLS

The Directorate of Valuation and Cadastre of the Municipality of Ambato notified land owners who have no closure, the obligation to build them. This provision is for properties located within the city limits of the city and consolidated areas of the townships in the county.

The requirement set forth in Article 3 of the Ordinance of the land enclosures of the urban area of \u200b\u200bAmbato and consolidated areas of townships. If within a period of ninety days of this notice (02 February, 2011) has not been started the work or if not in one hundred and fifty days ended the enclosure, the owner shall pay a fine equivalent to 2% of property value, according to the determined by Article 4 of the ordinance, the fine will be imposed each year in which the owner has not built the enclosure.

Where the City deems appropriate and especially when it goes against the beautification, sanitation and safety of any sector, the Public Works Department will proceed to build the enclosure and the Treasury will implement the Municipal an extra charge of 20%, without prejudice to the corresponding annual penalty. LLLLL LLLLLLLL





values \u200b\u200bare returned CHARGED IN MORE

The treasury of the Municipality of Ambato advised taxpayers to comply with Recommendations 5, 6 and 7 of the State Comptroller on assessment and collection of taxes: Property Tax, Urban and Rural, Excises and Utilities, Mayor Fernando Callejas by administrative decision-DA 10-152 provided for the repayment of amounts charged on, by way of urban and rural property taxes for the years 2006, 2007, 2008 and 2009. The

Taxpayers are entitled to this refund should come in time from 08:00 to 15:00 at the window 5 of the Municipal Treasury, located in Castle Street and Bolivar, present your identification card and sign a receipt for the delivery cash. The values \u200b\u200bto be returned can be viewed by accessing the website: www.ambato.gob.ec, link "online consultation", enter name, ID, RUC or CIU in "refers to refund of taxes" and click view. LLLLL


LLLLLLLLL

Saturday, February 5, 2011

Pokemon Trading Card Game 2 J Rom

Pinllo RECOVERY PATHS AND PEDESTRIAN STAIRS

The city of Ambato, in order to prioritize pedestrian improvement work performed expanding green areas and sidewalks in several road sections of the central town of the city. With this vision took part in the Av's Shirys between Rumiñahui and Manco Capac, providing better service to pedestrians and students of educational institutions in the sector and that looks more decorative vegetation. He placed

cobblestone walk several colors in an area of \u200b\u200b1,860 m2, built 714 meters linear prefabricated curbs, was built 19 bases for light poles, construction of 30 electrical check boxes, in these works, the municipality invested 64,188 $ 14.
City staff made the formation of flower: Change land in their gardens and placement of humus soil in them, for it was used a backhoe and two trucks.
trees were preserved in this way and proceeded to plant a variety of ornamental plants and recovered in the new planters, beautifying and improving the image.
The public and students should work with the care of plants and new green areas recovered and walk through the pedestrian compliance with the boxes. LLLLLLL


LLLLLLLLLL


CITY PAVING WAY IN IZAMBA


various road works are executed and income in different sectors of the parish Izamba, allowing greater accessibility and traffic alternatives for the citizens of this important sector of the city.

are two important ways in which it is intervening, connecting these commercial areas to main roads. With an investment of $ 40,000 involved in the street Neptalí Sancho, which is made of asphalt paving works in an area of \u200b\u200b2,500 square meters and 600 meters is built curbs.

In this same parish, invested $ 100,000 in asphalt paving of 6,400 square meters of Barona Abel Street and 1,600 linear feet of curbs, prior to the paving will be placed 800 linear feet of pipe and water service connections.

the Municipality of Ambato previously intervened in the market surrounding roads Santa Clara, which has improved the vehicular traffic in the area and business. LLLLLL


LLLLLLLLLL


LA MERCED, FULLY RECOVERED

The city of Ambato, in urban regeneration work, made the extension of sidewalks and placement of boxes in different areas of the city village , so that currently the entry of the Iglesia La Merced, calle Rocafuerte is fully regenerated and enhances the image of this important sector.

This urban regeneration involves the expansion of sidewalks with decorative paving placement of concrete for various colors of the strongest in the driveway, building flower boxes, planting trees, sinks and bollards, $ 48,603.58 was spent.

This work is part of a series of urban regeneration that included other sections in the city as Bolivar Street, between Castle and Guayaquil, calle Martínez Rocafuerte between Lalama and already serving the public, especially the bystander now has more space and security for travel.

LLLLLLLLLL LLLLLL



RECAPEO MARTINEZ IN WAY OF

The city of Ambato, within its track maintenance work performed recapeo of 4 major traffic arteries of the parish Augusto N. Martínez, investing $ 65,000.
intervened streets are: Bamboo, Chanul, Ceiba and Los Tilos, they allow a direct connection to the main street of the parish The Reeds, also operated by this administration.
These interventions are performed by the degree of need and importance, so the street Chanul income benefits the students of the School Secundino Egüez. Similarly
Bamboo Street, Ceiba and Los Tilos, allow direct access to the Atocha sector through the main artery The Reeds.
Importantly sewer placement was performed in a portion of these pathways.

Tuesday, February 1, 2011

How Much Braces Cost In Dubai

GREEN AREAS OF APRIL 13

The city of Ambato, in order to tidy up areas and provide better access and safety to the public, carries out the recovery of pedestrian steps from the sector serving the Ave April 13, Floreana, Tupac Yupanqui and provides access to Valentine's Park. This intervention is an amount of $ 45,139.47, the contractor performing the work is Geovanny Sanchez.

Work has performed include: improvement and standardization of existing steps, change of tube walls and railings to provide visibility and security to the citizens passing through that sector, there will be improved with planting nurseries and more variety of cactus dry gardens, and finally made arrangements and paint sector. Importantly, sewer work that had to be carried out in the street Tupac Yupanqui regarding construction of a sewerage system by the passage of the stands. LLLLL LLLLLLLL






AMBATO COLLEGE LOOKOUT

Municipal Public Works within planning for 2010, considered it important to intervene and retrieve two viewpoints in the city, such as: the area outside the theater of Ambato and the College Park area off Juan Benigno Vela.

These sectors balcony built two such viewpoints, the same highlights and let the light of the Ambato river banks and in the second view of the city in general.

The works to be performed are: Construction of decorative fencing about 140 meters, improving sidewalks and placement of decorative paving stones in them. Was coordinated at the Utility Ambato, which then place the necessary lighting and complementing this intervention.

With this type of public sector interventions and tourist rescues that were in poor condition, transforming them into secure sites that let you enjoy a wonderful panoramic view of the city.